News

Liberty grinder pump review

Liberty grinder pump grind-off pays off with 400% growth.

Smith Pump Completes the Fit Test for a Project for the City of Dallas

September 2016:  Smith Pump completes the Fit Test

Large Vertical Lineshaft Turbine Pump Disassembly

CLICK THE VIDEO TO WATCH: It takes two bridge cranes to handle the 10,000lb discharge head on this large vertical  axial flow line shaft pump.  This unit is one of six that pump treated effluent from a wastewater treatment plant over the levee into the Trinity River in north Texas.  This unit is rated 38,000 gallons per minute and is in for repair. CLICK THE IMAGE

Canadian River MWA visits Smith Pump and meets Chip and Joanna Gaines too

The Canadian River Municipal Water Authority paid a visit to Smith Pump - Waco in January 2017.  The highlight at dinner (135 Prime in Hewitt) was a group photo with Chip and Joanna Gaines from the HGTV show FixerUpper.  From left to right, Danny Sims, Darren Schick, Joanna Gaines, Chip Gaines, Granger Smith, and Chad Pernell.

Smith Pump Completes the Fit Test for a Project for the City of Dallas

Smith Pump Completes the Fit Test for a Project for the City of Dallas

September 2016:  Smith Pump completes the Fit Test on a large flood control pump project for the City of Dallas.  Pump motors and gear boxes were pre-assembled on their support structure at Smith’s – Waco shop to check shaft alignment and machining accuracy.  The 3750hp motors...

Successfull External Surveillance Audit for their ISO 9001:2008 Certification | Smith Pump Company Inc.

Waco, TX -  Smith Pump Company, Inc. successfully underwent an external surveillance audit (assessment) for their ISO 9001:2008 certification. The third party registrar, Perry Johnson Registrars Inc., performed the assessment to ensure that SPCO’s Quality Management System (QMS) continues to meet all elements of the scope of registration and effectively maintains the entire requirements of the ISO 9001:2008 International Standard. There were two (2) minor non-conformances identified during the assessment....